Potential
Our Key Attributes
Our Key Attributes
- Highly qualified and experienced workforce across all roles and levels;
- Highly specialized production area:
- Main Production Hall (W1) 111514 ft2
- Production Preparation Hall 33066 ft2
- Special Assembling Area 5360 ft2
- Mechanical Treatment Hall 5920 ft2
- Final Assembling Hall 19913 ft2 for steel elements
- Blasting Chamber 18x6x6 m
- Storage Hall 14531 ft2
- 32291 ft2 storage area outside with 32 t crane
- ISO 9001;ISO45001;EN 1090;EN ISO 3834for steel construction preparation of EXC1, EXC2, EXC3, EXC4 class elements
- Production Capacity for up to 700 tons of steel constructions monthly with successfully changing backyard
- Usage of latest technologies and machines in the production process
- More than 170 welding Certificates (WPQR)
PRODUCTION EQUIPMENT
EXECUTED PROJECTS